Division of Petroleum & Chemical Safety

 

Facility: 2020694 Tank: 6

Click for Facility/Tank Ownership history

Capacity: 12000
Product: Diesel Fuel
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 5/7/1999
Current Age: 25
Install Date: 11/20/1998
Last Used Date:
Product Date: 4/19/1999
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection South Dispensers 11/12 13/14 3/11/2024 3/11/2025
Leak Detect - Piping Mechanical Pressurized Line Leak Detection North Bulk Loader Sump 3/11/2024 3/11/2025
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD 7/8/2019 3/11/2024 3/11/2025
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors 7/8/2019 3/11/2024 3/11/2025
Overfill Prev Device Overfill Alarm 2/7/2022 2/7/2025
Overfill Prev Device Overfill Drop Tube Valve 2/7/2022 2/7/2025
Piping Fiberglass Double Wall A.O. Smith Dispensers 11/12 13/14 7/20/2020 N/A N/A
Piping Fiberglass Double Wall A.O. Smith Bulk Loader N/A N/A
Piping Single Wall STP/Tanktop Sump North Bulk Dispenser Sump 8/27/2021 8/27/2024
Leak Detect - Piping Sump Sensor with positive shutdown 3/11/2024 3/11/2025
Piping Single Wall STP/Tanktop Sump South Dispensers 11/12 13/14 8/27/2021 8/27/2024
Leak Detect - Piping Sump Sensor with positive shutdown 3/11/2024 3/11/2025
Spill Contain Device Single Wall Spill Bucket 8/27/2021 8/27/2024
Tank Fiberglass Double Wall XERXES N/A N/A

Latest Blended Fuel Compatibility Form

No Compatibility Forms Listed


Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall A.O. Smith Precision Test Pass 3/11/2024 Show History
Piping Fiberglass Double Wall A.O. Smith Precision Test Pass 3/11/2024 Show History
Piping Fiberglass Secondary Containment Steel primary Precision Test Pass 2/12/2020 Show History