Division of Petroleum & Chemical Safety

 

Facility: 2047583 Tank: 3

Click for Facility/Tank Ownership history

Capacity: 6000
Product: E85
Status: Currently in use
Regulated Status Federal
OSFM First Notify Date: 9/18/2023
Current Age: 0
Install Date: 6/23/2023
Last Used Date:
Product Date:
Petroleum Use:
CERCLA Substance:
CAS Code:
Removed Date:
Abandoned Material:
Abandoned Date:
Red Tag Issue Date:
Fee Due: $0.00
UL Number G03359836

Equipment Information

Equipment Type Equipment Install Date Last Passing Test Date Test Expire Date Failed Test Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Electronic Pressurized Line Leak Detection 11/2/2023 11/2/2023 11/2/2024
Leak Detect - Tank Automatic Tank Gauging Veeder Root TLS 450 Plus with CSLD 11/2/2023 11/2/2023 11/2/2024
Leak Detect - Tank Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor 11/2/2023 11/2/2023 11/2/2024
Overfill Prev Device Overfill Alarm 11/2/2023 11/2/2023 11/2/2026
Overfill Prev Device Overfill Drop Tube Valve 11/2/2023 11/2/2023 11/2/2026
Piping Fiberglass Double Wall NOV Fiberglass Systems Red Thread IIA fiberglass piping 11/2/2023 N/A N/A
Piping Single Wall STP/Tanktop Sump 11/2/2023 11/2/2026
Leak Detect - Piping Sump Sensor with positive shutdown 11/2/2023 11/2/2024
Spill Contain Device Double Wall Spill Bucket 11/2/2023 11/2/2023 11/2/2026
Tank Fiberglass Brine Filled Double Wall XERXES 6/23/2023 N/A N/A

Latest Blended Fuel Compatibility Form

File Name Status Status Date
CompatibilityFormSummary05102023-103233.pdf Approved 5/14/2023

Compatibility Form Attachments

File Name Description
e85 veeder probe.pdf ATG Probe
e85 franklin all.pdf Ball Valves
E85 equipment approvals US Department of Energy.pdf Dispenser hose
e85 franklin spill.pdf Double Wall Spill Bucket
E85 veeder plld and sensors.pdf Electronic Pressurized Line Leak Detection
e85 xerxes.pdf Fiberglass Brine Filled Double Wall
e85 frp pipe.pdf Fiberglass Double Wall fiberglass piping
E85 equipment approvals US Department of Energy.pdf Flex Connector Steel
e85 dope.pdf Gasoila E Seal
e85 gilbarco.pdf Gilbarco
E85 equipment approvals US Department of Energy.pdf Hose
e85 veeder sensor.pdf Hydrostatic Reservoir Interstitial Monitoring Sensors with monitor
E85 veeder plld and sensors.pdf Non-Discriminating Sump Sensor with positive shutdown
e85 opw.pdf Nozzle
E85 equipment approvals US Department of Energy.pdf Overfill Alarm
e85 opw.pdf Overfill Drop Tube Valve
e85 shear valve.pdf Shear Valves
e85 xerxes.pdf Single Wall STP/Tanktop Sump
e85 bravo.pdf Single Wall UDC Sump
e85 franklin all.pdf Submersible Turbine Pump

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date History
Piping Fiberglass Double Wall NOV Fiberglass Systems Red Thread IIA fiberglass piping Precision Test Pass 11/2/2023 Show History
Tank Fiberglass Brine Filled Double Wall XERXES Precision Test (Tank) Pass 11/2/2023 Show History