4, 5, 6 |
Line interstitial sensors have been raised and rendered inoperational. - Diesel STP containment sump sensor raised out of liquid. Remove liquid and lower sensor. Dispenser 1/2 sump sensor raised and must be lowered to be in contact with the bottom of the sump. |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. - No inspection reports completed. |
Facility |
Missing copies of current testing certificates for operator training - At least one person onsite has to be trained in UST Class C at all times at an attended facility. The person on site does not have class C training completed. |
Facility |
Missing list of designated Class A/B & C Operators - Update list. |
6 |
Piping sump tested triennially using low level positive shut off option. Sump does not meet low level test requirements. See remarks. Perform standard hydrostatic test on sump. - Diesel STP sump sensor raised out of liquid. |
4, 6 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
6 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. - Diesel STP sump. |