2, 4 |
Annual leak detection certification not completed (Required annually). - Verified with Tank Tech and the payment has been made, a permit will be acquired 7-12-23 along with a NOV extension request. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. - Verified with Tank Tech and the payment has been made, a permit will be acquired 7-12-23 along with a NOV extension request. |
2, 4 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). - Verified with Tank Tech and the payment has been made, a permit will be acquired 7-12-23 along with a NOV extension request. |
2, 4 |
Precision tank test required. - Due to not having any tank test records on site. |
2 |
Tank internal lining inspection past due (Required every 5 years). - Verified with Tank Tech and the payment has been made, a permit will be acquired 7-12-23 along with a NOV extension request. |
2, 4 |
Triennial spill prevention equipment testing not completed. - Verified with Tank Tech and the payment has been made, a permit will be acquired 7-12-23 along with a NOV extension request. |