1, 2, 3 |
Annual leak detection certification not completed (Required annually). |
3 |
Annual line precision and mechanical line leak detector functional test not completed. |
1, 2 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - STP sump lids are broken/missing, repair/replace. |
1, 2 |
Line interstitial sensor functional test not accomplished (Required annually). |
1, 2 |
Mechanical line leak detector requires annual functional test. |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. - Annual walkthrough inspection required to be completed by UST contractor, A/B Operator cannot perform this inspection. |
1, 2, 3 |
Not Vented Properly - Adequate collision protection to protect against physical damage shall be provided for vent piping. |
1, 2 |
Piping sump tested triennially using low level positive shut off option. Sump does not meet low level test requirements. See remarks. Perform standard hydrostatic test on sump. - STP sump sensors raised out of liquid. |
3 |
Tank monitor does not appear to function properly and requires maintenance. - Diesel UST, High water alarm. Upon inspection no water found in UST, repair required. |
1, 2 |
Water in containment with required interstitial sensors - Remove water and repair containments to prevent water ingress. - STP sumps contain liquid. |