1, 2, 3 |
Annual electronic line leak detector test not completed. |
1, 2, 3 |
Annual leak detection certification not completed (Required annually). |
1, 2, 3 |
Document that emergency shut-off (shear valves) are in proper working order |
Facility |
Facility Operation and Maintenance Plan not completed or available. |
1, 2, 3 |
Line interstitial sensor functional test not accomplished (Required annually). |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
Facility |
Missing copies of current testing certificates for operator training - Expired A/B Operator Certificate. |
Facility |
Missing copy of emergency instructions or emergency procedures plan |
Facility |
Missing list of designated Class A/B & C Operators |
1, 2, 3 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
1, 2, 3 |
Tank interstitial sensor functional test not accomplished (Required annually). |
1, 2, 3 |
Triennial testing for qualifying piping containment sump not completed (Required every 3 years). - All STP and dispenser sumps must be tested. |