Deficiencies (Current)
NOV Number:
E0020240582
(Pending)
Issue Date:
2/28/2024
Expiration Date:
4/28/2024
View NOV Form
Tanks |
Deficiency |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
1, 2 |
Annual leak detection certification not completed (Required annually). |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
1, 2 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
2 |
Triennial spill prevention equipment testing not completed. |
NOV Number:
E0020240583
(Pending)
Issue Date:
2/28/2024
Expiration Date:
4/28/2024
View NOV Form
Tanks |
Deficiency |
Facility |
Code complying instruction/warning signs are not properly mounted at each dispenser island |
Facility |
Dispensers require collision protection - Bollard protection needs to be installed on inside of dispenser1/2 (east side)and 3/4 (west side). There is no dispenser protection at this time. |
Facility |
Farthest dispenser is greater than 40' and site lacks a communication system or system is inoperable |