1, 2, 3, 4 |
Perform a site assessment - A site assessment is required when tanks are removed per 175.830(a)(21). Tank #1 listed above was removed on June 19, 2020 and tanks 2 & 3 were removed on March 15 2021, and tank #4 was removed on May 21, 2021. The required site assessment reporting form that must be completed by a supervising PE or PG has not been submitted yet. |