Division of Petroleum & Chemical Safety

 

Facility Details

Facility Number: 2046653
Status: Active
Facility Name: Murphy Oil USA, Inc. #8854
Address: 1035 S Rand Road
Lake Zurich, IL 60047
County: Lake
Property Parcel:
Facility Type: Attended Self-Service Station
Owner Type: Private
Green Tag Decal: Z000707
Green Tag Issue Date: 1/26/2024
Green Tag Expiration Date: 12/31/2026

Owner Details

Owner Name: Murphy Oil USA, Inc.
Owner Address: 200 E. Peach Street
El Dorado, AR 71730
Owner Status: Current Owner
Purchase Date:
Type of Financial Responsibility: Self-Insurance
Financial Responsibility Reporting Due Date: 6/29/2024

Motor Fuel Dispensing Permits

MFD Permit Type Issue Date Expiration Date
Self Service 1/26/2024 12/31/2026

Owner Summary

Click for Facility/Tank Ownership history
Owner Number Owner Name Owner Status Purchase Date
U0029289 Murphy Oil USA, Inc. Current Owner

Permits (Unexpired)

Click for permit history

No Active Permits Found

Deficiencies (Current)

No Deficiencies Found

IEMA Numbers Associated with the Facility

No IEMA Numbers Found

LUST Fund Eligibility and Deductibility Determinations

No Applications Found

Pay Tank Fees Online

Tank Information



Tank Number 1

Capacity: 25000 Petroleum Use:
Product: Gasoline - Regular CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 10/4/2018 Abandoned Material:
Current Age: 5 Abandoned Date:
Install Date: 7/13/2018 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date: 9/26/2018

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 6/27/2023 6/27/2024
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 6/27/2023 6/27/2024
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors With Monitor 6/27/2023 6/27/2024
Overfill Prev Device Overfill Drop Tube Valve 8/16/2021 8/16/2024
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall STP/Tanktop Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024
Spill Contain Device Double Wall Spill Bucket 6/27/2023 6/27/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test Pass 6/27/2023



Tank Number 2

Capacity: 8000 Petroleum Use:
Product: Gasoline - Premium CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 10/4/2018 Abandoned Material:
Current Age: 5 Abandoned Date:
Install Date: 7/13/2018 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date: 9/26/2018

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 6/27/2023 6/27/2024
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors With Monitor 8/1/2023 8/1/2024
Overfill Prev Device Overfill Drop Tube Valve 8/16/2021 8/16/2024
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall STP/Tanktop Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024
Spill Contain Device Double Wall Spill Bucket 6/27/2023 6/27/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test Pass 6/27/2023



Tank Number 3

Capacity: 10000 Petroleum Use: None
Product: Diesel Fuel CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 10/4/2018 Abandoned Material:
Current Age: 5 Abandoned Date:
Install Date: 7/13/2018 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date: 9/26/2018

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 6/27/2023 6/27/2024
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors With Monitor 8/1/2023 8/1/2024
Overfill Prev Device Overfill Drop Tube Valve 8/16/2021 8/16/2024
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall STP/Tanktop Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024
Spill Contain Device Double Wall Spill Bucket 6/27/2023 6/27/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test Pass 6/27/2023



Tank Number 4

Capacity: 8000 Petroleum Use:
Product: E85 CERCLA Substance:
Status: Currently in use CAS Code:
Regulated Status: Federal Removed Date:
OSFM First Notify Date: 10/4/2018 Abandoned Material:
Current Age: 5 Abandoned Date:
Install Date: 7/13/2018 Red Tag Issue Date:
Last Used Date: Fee Due: $0.00
Product Date: 9/26/2018

Equipment

Equipment Type Equipment Last Passing Date Test Expire Date
Corrosion Prot - Piping Fiberglass Non-Corrosive N/A N/A
Corrosion Prot - Tank Fiberglass Non-Corrosive N/A N/A
Leak Detect - Piping Mechanical Pressurized Line Leak Detection 6/27/2023 6/27/2024
Leak Detect - Tank Non-Discriminating Interstitial Monitoring Sensors With Monitor 8/1/2023 8/1/2024
Overfill Prev Device Overfill Drop Tube Valve 8/16/2021 8/16/2024
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX N/A N/A
Piping Single Wall STP/Tanktop Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024
Spill Contain Device Double Wall Spill Bucket 6/27/2023 6/27/2026
Tank Fiberglass Double Wall XERXES N/A N/A

Additional Tests

Equipment Type Equipment Test Type Test Result Test Date
Piping Fiberglass Double Wall Ameron Dualoy 3000/LCX Precision Test Pass 6/27/2023

Dispenser Information



Name\ID 1/2

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024



Name\ID 11/12

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024



Name\ID 13/14

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024



Name\ID 15/16

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024



Name\ID 3/4

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024



Name\ID 5/6

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024



Name\ID 7/8

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024



Name\ID 9/10

Status: Active
Equipment Type Equipment Last Passing Date Test Expire Date
Dispenser Single Wall UDC Sump 9/19/2023 9/19/2026
Leak Detect - Piping Sump Sensor with positive shutdown 6/27/2023 6/27/2024

MFD Motorfuel Dispensing Forms

Facility Number Name City Received Date Letter
2046653 Murphy Oil USA, Inc. #8854 Lake Zurich 07/17/2018 Letter Form