6, 7, 8, 9, 10 |
Monthly line interstitial sensor records not available. - Maintain one NORMAL report per LINE, per month, from ATG. Must maintain 24 months’ worth. (Liquid Status) |
6, 7, 8, 9, 10 |
Piping interstitial must be open in all sumps - Remove jumper tubing and/or Schrader valves in all STP and dispenser sumps. (Both DSL STPs, Syphon Bars, and all dispensers.) |
6, 7, 8, 9, 10 |
Precision line test required. - Due to missing monthly passing leak detection tapes. |
6, 7, 8, 9, 10 |
Precision tank test required. - Due to missing monthly passing tank leak detection tapes. |
6, 7, 8, 9, 10 |
Required monthly tank interstitial sensor records not available. - Maintain one NORMAL report per TANK, per month, from ATG. Must maintain 24 months’ worth. |
6, 7, 8, 9, 10 |
Required monthly tank leak test records not available. - Maintain one PASSING report per TANK, per month, from ATG. Reference 175.630 c)2)B) |
6, 7, 8 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |