Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
2 |
Install or replace lockable fill pipe caps. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
1, 2, 3 |
Required monthly tank interstitial sensor records not available. |
1, 2, 3 |
Required monthly tank leak test records not available. |
1, 3 |
Spill prevention equipment failed triennial testing. Must be repaired or replaced. |
1 |
Tank interstitial sensors in alarm or failed test, must repair or replace. |
1, 2, 3 |
Tank precision test required. |