Facility |
Facility Operation and Maintenance Plan not completed or available. - Facility Operations and Maintenance Plan is available at https://sfm.illinois.gov to download and complete. Maintain documentation on site. |
1, 2 |
Line interstitial sensors have been raised and rendered inoperational. - Both STP's. |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. - 30-day Walkthrough Inspection shall be completed, and documentation maintained on site. 30-Day Walkthrough Inspection form available at https://sfm.illinois.gov. |
Facility |
Missing copy of emergency instructions or emergency procedures plan - Form is available at https://sfm.illinois.gov to download and complete. Maintain documentation on site. |
Facility |
Missing list of designated Class A/B & C Operators - Form is available at https://sfm.illinois.gov to download and complete. Maintain documentation on site. |
1, 2 |
Monthly line interstitial sensor records not available. - Maintain one NORMAL report per LINE, per month, from ATG. Must maintain 24 months’ worth. (Liquid Status) |
2 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). - Triennial inspection of overfill device (drop tube valve) has not been completed. Testing shall be completed and submitted to OSFM. |
1, 2 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
1, 2 |
Triennial spill prevention equipment testing not completed. - Triennial inspection/testing of spill bucket(s) has not been completed. Testing shall be completed with passing results. |
1, 2 |
Triennial testing for qualifying piping containment sump not completed (Required every 3 years). - STPS. |