Division of Petroleum & Chemical Safety

 
Pay Tank Fees Online Print Detail Page Export to Excel

Facility Details

Facility Number: 2037166
Status: Active
Facility Name: Elgin Convenience 1
Address: 1190 N. McLean Blvd.
Elgin, IL 601231723
County: Kane
Property Parcel:
Facility Type: Attended Self-Service Station
Owner Type: Private
Green Tag Decal: X003316
Green Tag Issue Date: 6/29/2022
Green Tag Expiration Date: 12/31/2024

Owner Details

Owner Name: RPT Enterprises, LLC
Owner Address: 475 Supreme Drive
Bensenville, IL 60106
Owner Status: Current Owner
Purchase Date: 2/1/2016
Type of Financial Responsibility: Designated Savings Account
Financial Responsibility Reporting Due Date: 2/1/2025

Motor Fuel Dispensing Permits

MFD Permit Type Issue Date Expiration Date
Self Service 6/29/2022 12/31/2024

Owner Summary

Click for Facility/Tank Ownership history
Owner Number Owner Name Owner Status Purchase Date
U0038287 RPT Enterprises, LLC Current Owner 2/1/2016
U0027821 Three Brothers Petroleum, Inc. Former Owner 3/15/1999
U0027331 North Mclean Citgo LLC Former Owner

Permits (Unexpired)

Click for permit history

No Active Permits Found

Deficiencies (Current)

NOV Number: E0020240620 (Pending)    Issue Date: 3/5/2024    Expiration Date: 5/4/2024    View NOV Form

Tanks Deficiency
Facility Miscellaneous - LP gas storage cabinet in front of window.

NOV Number: E0020240621 (Pending)    Issue Date: 3/5/2024    Expiration Date: 5/4/2024    View NOV Form

Tanks Deficiency
Facility Annual Emergency Stop Inspection not completed or inspection report not available. - All emergency shutoff switches shall be tested annually to verify they shut down all STPs or dispensers. Perform test, complete form (form is available at www.sfm.illinois.gov) and maintain 2 years on site with other annual testing documentation.
2 Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - Section 175.410 Submersible, Under-dispenser, Transition and Other Containment Sumps a) All containment sumps must consist of a factory manufactured containment that is liquid-tight on its sides, bottom and at any penetrations and is compatible with the substance conveyed by the piping. Such containment shall also have a factory manufactured protective cover and supporting components that are properly maintained. If the protective cover or its supporting components are cracked, deteriorated or missing, the cover and supporting components that are defective shall be replaced.
Facility Missing copies of 30 day Walkthrough Inspection Report. - 30-day Walkthrough Inspection shall be completed, and 2 years of documentation maintained on site. 30-Day Walkthrough Inspection form available at www.sfm.illinois.gov. The form must be filled out by an A/B Operator, you must, initial each box that applies, date the form each month to ensure it is being done every 30 days, and the A/B operator must print and sign their name at the bottom. If more than one A/B operator fills out the form, then each must print and sign name at the bottom. Missing Oct, Nov, Dec 2023 and Jan, Feb 2024.
Facility Missing copies of Annual Walkthrough Inspection Report. - Annual Walkthrough by a licensed contractor shall be conducted and 2 years documentation maintained on site.
Facility Missing list of designated Class A/B & C Operators - Current list is not being maintained/updated.
1, 2, 3 Monthly line interstitial sensor records not available. - Maintain one NORMAL report per LINE, per month, from ATG. Must maintain 24 months’ worth.
1, 2, 3 Open electrical conduit or junction boxes. - JUNCTION BOX AT ATG MANWAY HAS BROKEN CAP WITH EXPOSED WIRING. REPLACE JUNCTION BOX. THE PREMIUM ALSO NEEDS A PROPER ATG RISER CAP.
1, 2, 3 Piping interstitial must be open in all sumps - Remove all jumper tubing/pull back test boots, remove caps from schrader valves for piping interstitial. 175.420 b. All STP's.
1, 2, 3 Precision line test required. - Annual third-party precision line and leak detector test is required.
1, 2, 3 Precision tank test required. - Precision tank test is required on tanks.
1, 2, 3 Required monthly tank leak test records not available. - Maintain one PASSing report per TANK, per month, from ATG. Must maintain 24 months’ worth. After Precision tank test you must maintain your leak detection and provide monthly tank "PASS" from the ATG.
1, 2, 3 Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). - Provide documentation that annual testing of all shear valves has been conducted and passed. Must maintain 2 years of inspection reports.
1, 2, 3 Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry.
1 Tank monitor does not appear to function properly and requires maintenance. - Indicator green light on panel of Veeder-Root ATG is/are not functional. Replace as necessary to provide proper operation.
1 Tank monitor does not appear to function properly and requires maintenance. - Tank “Probe Out” indicated on ATG. Repair/replace as necessary to clear ATG alarm and show "All Functions Normal" for all tanks. THE RUL ALSO NEED THE PROB REPAIRED THE PROBE IS CUT IN THE ATG MANWAY.
2 Tank monitor does not appear to function properly and requires maintenance. - Indicator green light on panel of Veeder-Root ATG is/are not functional. Replace as necessary to provide proper operation.
2 Tank monitor does not appear to function properly and requires maintenance. - Tank “Probe Out” indicated on ATG. Repair/replace as necessary to clear ATG alarm and show "All Functions Normal" for all tanks. THE RUL ALSO NEED THE PROB REPAIRED THE PROBE IS CUT IN THE ATG MANWAY.
3 Tank monitor does not appear to function properly and requires maintenance. - Indicator green light on panel of Veeder-Root ATG is/are not functional. Replace as necessary to provide proper operation.
3 Tank monitor does not appear to function properly and requires maintenance. - Tank “Probe Out” indicated on ATG. Repair/replace as necessary to clear ATG alarm and show "All Functions Normal" for all tanks. THE RUL ALSO NEED THE PROB REPAIRED THE PROBE IS CUT IN THE ATG MANWAY.

IEMA Numbers Associated with the Facility

No IEMA Numbers Found

LUST Fund Eligibility and Deductibility Determinations

No Applications Found

Pay Tank Fees Online

Tank Information

Tank Number Capacity Product Status Regulated Status Red Tag Issued Fee Due Abandon/Removal Date
1 15000 Gasoline - Regular Currently in use Federal $0.00
2 15000 Gasoline - Premium Currently in use Federal $0.00
3 15000 Diesel Fuel Currently in use Federal $0.00

Dispenser Information

Name\ID Status
1/2 Active
3/4 Active
5/6 Active
7/8 Active
9/10 Active
11/12 Active
13/14 Active

MFD Motorfuel Dispensing Forms

No Forms Found