Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation |
1, 2, 3 |
Annual electronic line leak detector test not completed. |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
1, 2, 3 |
Annual leak detection certification not completed (Required annually). |
1, 3 |
Dispensers - hoses cracked, split or worn and require replacement |
1, 2, 3 |
Line interstitial sensor functional test not accomplished (Required annually). |
1, 3 |
Line interstitial sensors have been raised and rendered inoperational. - Under dispenser 5/6 |
1, 2, 3 |
Monthly line interstitial sensor records not available. - Maintain one NORMAL report per LINE, per month, from ATG. Must maintain 24 months’ worth. |
1, 2, 3 |
Precision line test required. |
1, 2, 3 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
1, 2, 3 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |