Facility |
A/B operator retraining required as a result of issuance of the Notice of Violation |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. |
Facility |
Missing list of designated Class A/B & C Operators - Needs updating |
5, 6, 7 |
Monthly impressed current log not available or maintained. |
5, 6, 7 |
Precision tank test required. |
5, 6, 7 |
Required monthly tank leak test records not available. |
7 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
5, 6, 7 |
Tank monitor does not appear to function properly and requires maintenance. - Repair alarms |