Facility |
Facility Operation and Maintenance Plan not completed or available. - Needs to be filled out completely. |
5, 6 |
Miscellaneous - Cathodic protection needs to be installed. |
6 |
Miscellaneous - Double Poppet Shear Valves needed. 175.450 e)12)B)ii) |
7 |
Miscellaneous - Cathodic protection needs to be installed. |
7 |
Miscellaneous - Double Poppet Shear Valves needed. 175.450 e)12)B)ii) |
Facility |
Missing copy of emergency instructions or emergency procedures plan - Needs to be filled out completly . |
Facility |
Missing list of designated Class A/B & C Operators - Needs to be filled out completely. |
5, 6, 7 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |