1, 2, 3 |
Perform a site assessment - Tanks 1, 2 & 3 were removed on 11/30/21. Per Il. Adm. Code 176.330, a site assessment must be conducted at time of removal by a supervising Licensed Professional Engineer (PE) or Professional Geologist (PG). Within 45 days after receipt of lab results from the full site assessment, a “Site Assessment Results” form along with the analytical data must be submitted electronically to the OSFM by the supervising PE or PG. The form can be obtained at: https://webapps.sfm.illinois.gov/USTPortal/Forms/SiteAssessmentResults. |