Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. |
7, 8, 9 |
Annual leak detection certification not completed (Required annually). |
7, 8, 9 |
Annual line precision and mechanical line leak detector functional test not completed. |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. |
Facility |
Missing list of designated Class A/B & C Operators |
7, 9 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). |
7, 8, 9 |
Shear valve inspection report not completed (Required during Annual Walkthrough Inspection). |
7, 8, 9 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |
7 |
Stick inserted in drop tube overfill device rendering it inoperative - Remove stick. |
8, 9, 10 |
Triennial spill prevention equipment testing not completed. |