Facility |
Facility Operation and Maintenance Plan not completed or available. - Facility Operations and Maintenance Plan is available at https://sfm.illinois.gov to download and complete. Maintain documentation on site. |
Facility |
Financial responsibility must be reported yearly - Financial Responsibility form can be found at https://webapps.sfm.illinois.gov/USTPortal/Forms/FinancialResponsibility. |
Facility |
Missing list of designated Class A/B & C Operators |
6 |
Open electrical conduit or junction boxes. - Premium STP Junction box is missing the plugs. Repair/replace. |
7, 8 |
Water in containment without required interstitial sensors - install cathodic protection on all exposed steel. - Both regular STPs. |