2, 4, 5, 6, 7 |
Annual electronic line leak detector test not completed. - Annual third party testing required on all line leak detectors. |
Facility |
Annual Emergency Stop Inspection not completed or inspection report not available. - All emergency shutoff switches shall be tested annually to verify they shut down all STPs or dispensers. Perform test, complete form (form is available at www.sfm.illinois.gov) and maintain on site with other annual testing documentation. |
2, 3, 4, 5, 6, 7 |
Annual leak detection certification not completed (Required annually). - Annual leak detection certification (ATG) not completed. |
2, 3, 4, 5, 6, 7 |
Line interstitial sensor functional test not accomplished (Required annually). - Annual third party testing required on all line interstitial sensors. |
Facility |
Missing copies of 30 day Walkthrough Inspection Report. - 30-day Walkthrough Inspection shall be completed and documentation maintained on site. |
Facility |
Missing copies of Annual Walkthrough Inspection Report. - Annual Walkthrough by a licensed contractor shall be conducted and documentation maintained on site. |
2, 3, 4, 5, 6, 7 |
Overfill prevention equipment inspection(s) not completed (Required every 3 years). - Triennial inspection of overfill prevention device (overfill drop tube valve, overfill alarm,) has not been completed |
2, 3, 4, 5, 6, 7 |
Tank interstitial sensor functional test not accomplished (Required annually). - Annual third party testing required on all tank interstitial sensors. |