Deficiencies (Current)
NOV Number:
E0020241269
(Pending)
Issue Date:
5/1/2024
Expiration Date:
6/30/2024
View NOV Form
Tanks |
Deficiency |
1, 2 |
Containment support components are cracked, deteriorated or missing. The cover and supporting components that are defective shall be replaced with factory manufactured components. - Have contractor repair or replace ground cover to allow for inspection. |
Facility |
Miscellaneous - Bollard needs to be installed on south side of dispenser 5/6. |
1, 4 |
Spill prevention equipment contains liquid/debris and must be cleared of materials and maintained clean and dry. |